Guam Regional Medical City (GRMC)

Project Specifications
- Project Cost: $215 Million
- Location: Dededo, Guam
- Hospital Size: 267,000 sq. feet
- Bed Capacity: 130
- Construction Workforce: Approx. 300
- Hospital Workforce: Approx. 400
- Opened in 2015, Completed in 2016
This infrastructure is configured to allow hospital services to operate in the most efficient possible manner to best serve the needs of the patients, staff, the healthcare organization and the environment.
The design of the infrastructure facilitates distributed intelligence, allowing the systems to interoperate in different ways within the control center and monitoring of energy in different departments of the facility.
- Improved patient and staff safety in the mental health facility with staff protection and access control systems
- Improved the environment in a patient room with nurse call services, patient lighting and environmental control
- Improved energy efficiency in the energy source